energy consult GmbH from Cuxhaven takes over the long-term technical operations management of the ”Wölsickendorf” wind farm in Brandenburg with a total of 16.8 megawatts.
The wind farm consists of four V150 wind turbines with 4.2 megawatts each. Construction of the wind farm has already begun, and commissioning is planned for the end of the year. The owner of the wind farm in Brandenburg is the CEE Group from Hamburg.